Concrete Canoe
Last Update 3/5/2019
The Concrete Canoe Design Report and Project Overview and Technical Addendum must be submitted / postmarked by March 7th.
This is the absolute latest we will accept reports to provide the judges adequate time for review so we recommend sending it in sooner. Please submit a copy of the Design Report and Project Overview and Technical Addendum to pswc2019@gmail.com and send 5 physical copies of the design report to:
PSWC 2019 Attn: Alissa Mimm
Building 13 - Civil and Environmental Engineering
1 Grand Ave.
San Luis Obispo, CA
93407 - 0353
Also, upload your Design Report and POTA to the ASCE Xythos server as specified in the competition rules.
This is the absolute latest we will accept reports to provide the judges adequate time for review so we recommend sending it in sooner. Please submit a copy of the Design Report and Project Overview and Technical Addendum to pswc2019@gmail.com and send 5 physical copies of the design report to:
PSWC 2019 Attn: Alissa Mimm
Building 13 - Civil and Environmental Engineering
1 Grand Ave.
San Luis Obispo, CA
93407 - 0353
Also, upload your Design Report and POTA to the ASCE Xythos server as specified in the competition rules.